|
Most of our boats are delivered by lorry (up to
50 feet) to Bénodet, Lorient or Gruissan Mediteranean
and are then prepared and launched to be delivered
to our customers.
In some instances, we deliver the
boats to the customer's port of registry
and we prepare the boats on site
with a team of technicians.
Between leaving the factory by lorry
and the final delivery to the customer, you should
count roughly 10 to 15 days of preparation:
antifouling, stevedoring, assembly of electronic
devices or additional options, launching, masting,
trials at sea and handing over.
This stage is essential for the long
life of the boat. Careful preparation is a guarantee
of reliability and peace of mind
for the owner.
We systematically go through the
handing over process with you so that you can familiarize
yourself with the boat's technical background. This
service can take half a day for small boats and
3 full days for the larger ones.
|